Product comparison
Loop (circular) cross-belt sorters vs straight-line linear sorters —throughput, footprint, cost and retrofit trade-offs explained to help you pick the right architecture.
Both use the same individually driven trolley belts —but loop and linear sorters solve different problems. Choosing the wrong one costs floor space, money or both.
In a loop sorter, trolleys travel a closed ring and discharge to chutes on both sides. This architecture packs the most destinations per square meter and reaches 8,000–10,000+ pcs/h. It is the default for high-throughput express hubs and large cross-border operations. Twin-ring systems exceed 1,800 exits.
The linear (straight-line) sorter runs one direction along a corridor. It needs minimal civil work, splices into existing conveyor networks and costs less at 2,000–6,000 pcs/h. It is the practical choice when you cannot rebuild the warehouse or your destination count is modest.
Common questions
A loop sorter is a closed circular ring discharging chutes on both sides, optimized for maximum destinations and high throughput. A linear sorter runs in a straight line, is cheaper and easier to retrofit into existing conveyor corridors at lower throughput.
Choose a loop when you need 8,000+ pcs/h, hundreds of destinations, and want the most sorting capacity per square meter —typical for express hubs and large e-commerce or cross-border operations.
Choose linear for mid-volume operations (2,000–6,000 pcs/h), modest destination counts, and especially when retrofitting an existing building where you cannot add a circular machine.
Yes, typically. Linear systems have a shorter track, simpler mechanical build and lower installation cost, but they scale less —once throughput or destinations exceed their range, a loop becomes the better long-term investment.
Send your parcel volume and destination count —our engineers reply with a configuration within 24 hours.
Get started
Send us your parcel volume, package mix and floor plan —our engineers reply with a tailored layout and quotation within 24 hours.