Case Studies / Loop Cross-Belt Sorting Hub
Case study 01
A high-throughput ring sorter installed for an express parcel operation —clearing up to 10,000 parcels per hour through a single multi-lane induction system.
Project background
The customer's express operation was sorting several tens of thousands of parcels nightly by hand and with an aging pop-up sorter. Every parcel had to clear the hub before the last dispatch departure, and the gap between volume and sortation capacity was shrinking every month.
Client challenges
Our solution
We engineered and installed a loop cross-belt sorter sized to the hub's nightly peak, with multi-lane DWS-equipped induction feeding the ring at full capacity. Belt and roller conveyors connect inbound, induction, discharge chutes and take-away, and our WCS drives destination assignment with full integration to the customer's WMS.
Performance outcome
On-site


Send your nightly volume and destination count —we size the sorter and quote within 24 hours.
Get started
Send us your parcel volume, package mix and floor plan —our engineers reply with a tailored layout and quotation within 24 hours.